Drying Oven Loading and Unloading using a Wireless Control Network

Problem statement

The client intended to further automate their production process in a high-temperature environment where a cable- based connection to control the carts was not physically feasible

Implementation scenario

Leveraging our technical expertise, we integrated our Bridge E devices on the carts next to the PLC and set up the necessary infrastructure. Hence, we could provide a low latency, zero-downtime wireless link to the main infrastructure PLC, ensuring a seamless and efficient production process.

Business impact

Our solution enabled the customer to upgrade their controls and further automate their production process to realize higher efficiency and throughput.

Traffic: B&R Powerlink
Latency: 20 ms
Coverage: 10 x 20 m corridor
Roaming: No
Network: 6 devices

See all Success Stories

Do you want to be our next success story?

Our wireless solution expert is there for you and will accompany your complete project with you.

Leave us your contact details and we will get back to you within 24 hours.

What is the sum of 6 and 2?